The six things that must be true, whether each is true right now, and what’s moving to close the gap — so the state lives here, not in your head.
Tonight, honestly: the loop ran end-to-end for the first time — with 12 logged hand-assists. Each one is a build in flight to delete it:
Machine tally, 8:25pm: 345 queued · 85 copying · 51 being graded overnight · 4 re-grading after fixes · 23 parked with named reasons · 4 held red · 2 live in the wild.
This board is v1 — I update it at every landing. V2 (chartered next): this strip drawn straight from the machine’s own state file, so it cannot go stale even if I do.
Tonight, honestly: 0 machine-green sites. Four graded red with named, fixable causes:
Next landing: heal → re-grade the four → from then on, green means green.
Closed tonight: the route-wipe class that took Valley Oak dark this morning is shut three ways — routes live in the file on both code trees, the auto-merge guard survived an independent break-attempt (and got two holes fixed), and deploys are held to aligned trees.
Still red: forms sending — the one red that gates every cutover. The first fix shipped and the same error came back from one layer deeper; a fresh diagnosis is running now. No client is exposed (every send is pinned to our test inbox), but no site cuts over until a form submission provably becomes an email in an inbox.
Next landing: forms cure → full court → one deploy paste from Robert → delivery receipts.
Tonight, honestly: 2 of 5 watchers live. Running: the 404 recorder (already made its first real catch — missing pages on a live site) and the hourly miss-alarm. Missing: forms delivery receipts (blocked on the forms red) · analytics + call-tracking checks (chartered, not built) · route-drift watch (chartered).
This gap is exactly why you were the one who caught the done-site issue. This arc exists so that sentence can never be true again.
Next landing: watcher builds enter the lanes immediately behind tonight’s six.
State: the sheet is the single truth surface. Founding scar, tonight: four rows released on hand-checks, then machine-graded red. New release rule: rows go to the team machine-green only; anything hand-checked is labeled as exactly that.
Next landing: green-only releases resume the moment the four re-grade.
Annotate anything on this page — your marks reach me. Arc names, missing arcs, wrong weights: red-pen directly.